I-16 Bridge Repair

Dublin, GA - 2017

Description

An oversized truck hit the underside of the I-16 bridge in Dublin, Georgia, causing damage to the overpass. During the repair process the Georgia Department of Transportation utilized FORTA-FERRO® macro synthetic fiber to reinforce the concrete bridge deck. FORTA-FERRO® offered increased impact resistance, reduction in potential cracking and for an overall tougher more durable concrete slab.

Key Points

  • Reduced Shrinkage Cracking
  • Saved Time
  • Saved Money

Download PDF

Calculate Your Savings!
Select Unit:US TonMetric Ton
Enter Asphalt:

Enter Asphalt Price:
FORTAfied asphalt for Tons of Savings!

Use our Savings Calculator to compare material costs between a traditional asphalt mixture and FORTAfied Asphalt.

Original Asphalt Cost:

Reduction in Asphalt Thickness:

Reduced Asphalt Cost:
Cost of FORTA-FI (based on MSRP):

FORTAfied Asphalt Cost =

Material Cost Savings =
Savings in Tons =