Project Description
FORTA-FERRO® were used at the GaReat Sports Complex in Geneva-On-The-Lake, Ohio. The Spire™ Institute – Phase IV project utilized the FORTA-FERRO® in two exterior concrete parking lot areas, a 10 lane, 50 meter Olympic size pool and additional 25 meter pool. Both pools called for approximately 1,000 yards of FORTA-FERRO® reinforced concrete at 4.0 lbs. / cu. yd. The FORTA-FERRO® was chosen as the reinforcement of choice because of its ability to minimize cracking. The concrete supplier, general contractor and finisher have a working comfort level with the FORTA-FERRO® due to past projects and reported no issues when it came to mixing, placing and finishing the fiber reinforced concrete.
Key Points:
- Reduced Cracking
- Extreme Durability
- Mixing