Correll Hall – Athens, GA

Athens, GA - 2014

Project Description

The engineering firm for the University of Georgia’s Correll Hall project originally specified conventional wire mesh for this slab-on-ground application.  The finishing contractor requested a steel to fiber proposal from Forta Corporation to convert the wire mesh to FORTA-FERRO macro synthetic fiber. Contractors, along with FORTA team members, were able to easily convert the specified reinforcement from wire mesh to FORTA-FERRO for ease of use and increased safety. Superior mixing was crucial to this project which utilized a bucketed crane delivery from the ready-mixer.

Key Points

  • Easy to Use
  • Superior Mixing
  • Increased Safety

Download PDF

Calculate Your Savings!
Select Unit:US TonMetric Ton
Enter Asphalt:

Enter Asphalt Price:
FORTAfied asphalt for Tons of Savings!

Use our Savings Calculator to compare material costs between a traditional asphalt mixture and FORTAfied Asphalt.

Original Asphalt Cost:

Reduction in Asphalt Thickness:

Reduced Asphalt Cost:
Cost of FORTA-FI (based on MSRP):

FORTAfied Asphalt Cost =

Material Cost Savings =
Savings in Tons =