Blominmäki Wastewater Treatment Plant – Espoo, Finland

Espoo, Finland - 2019-2020

Project Description

Blominmäki, a large underground wastewater treatment plant, approximately 300 m x 400 m, used FORTA-FERRO macro synthetic fiber to reinforce multiple applications including driving paths and wastewater pools. This big project, in Espoo, Finland, replaced traditional wire mesh with a fiber dosage of 4.5 kg/m3. Using FORTA-FERRO will reduce cracking and increase the durability of the concrete in this underground facility. Speed of construction was increased using fiber and this led to cost savings as a result.

Key Points

  • Increase Durability
  • Speed of Construction
  • Reduce Cracking
  • Cost Savings

Download PDF

Calculate Your Savings!
Select Unit:US TonMetric Ton
Enter Asphalt:

Enter Asphalt Price:
FORTAfied asphalt for Tons of Savings!

Use our Savings Calculator to compare material costs between a traditional asphalt mixture and FORTAfied Asphalt.

Original Asphalt Cost:

Reduction in Asphalt Thickness:

Reduced Asphalt Cost:
Cost of FORTA-FI (based on MSRP):

FORTAfied Asphalt Cost =

Material Cost Savings =
Savings in Tons =