Old Dominion Freight Line – Medford, OR

Medford, OR - 2018

Project Description

The Old Dominion Freight Line is expanding many of their existing facilities, so they need additional areas in their facilities to be paved. One location that is expanding is located in Medford, OR. The owners chose to use FORTA-FERRO macro synthetic fibers with a dosage of 5.0 lb/ cu yd, in this 6400-cu yd project, that has proven to add durability to the concrete as well as make for tougher concrete. The fibers also eliminate the need for traditional steel reinforcements, saving time and labor for the contractor. In many cases, when using steel reinforcements, the concrete must be pumped to avoid disrupting the steel. By eliminating the steel and using FORTA-FERRO fibers, in most cases, the concrete can be tailgated. Old Dominion has used FORTA-FERRO fiber successfully across the country and will continue to do so with great success.

Key Points:

  • Increase Durability
  • Save Time
  • Cost Effective

Download PDF

Calculate Your Savings!
Select Unit:US TonMetric Ton
Enter Asphalt:

Enter Asphalt Price:
FORTAfied asphalt for Tons of Savings!

Use our Savings Calculator to compare material costs between a traditional asphalt mixture and FORTAfied Asphalt.

Original Asphalt Cost:

Reduction in Asphalt Thickness:

Reduced Asphalt Cost:
Cost of FORTA-FI (based on MSRP):

FORTAfied Asphalt Cost =

Material Cost Savings =
Savings in Tons =