FORTA-FERRO® - Slab-On-Ground

This newly constructed industrial park in Portage, MI used FORTA-FERRO macro synthetic fibers in this 80,000 sq ft warehouse floor and dolly pads.

FORTA-FERRO® - Pavement

Traditional steel reinforcement was replaced with 8.0 lb/cu yd FORTA-FERRO macro synthetic fibers, using a 35’ x 35’ joint spacing.

FORTA-FERRO® - Pavement

The wire mesh in the pavement on these newly constructed concrete ready mix, block, and precast yards was replaced with FORTA-FERRO macro synthetic fiber.

FORTA-FERRO® - Precast

The use of FORTA-FERRO reinforcement fibers has reduced micro cracking and added needed toughness. These fibers have increased impact and fatigue resistance as well as increasing post crack residual strength.

FORTA-FERRO® - Slab-On-Ground

It is the second addition to their facility in which they used non-corrosive FORTA-FERRO macro synthetic fiber instead of traditional steel fiber.

FORTA-FERRO® - Slab-On-Ground

Due to the high costs of traditional steel reinforcement this contractor was able to pass on some of the savings to the customer by using a macro synthetic reinforcement.

FORTA-FERRO® - Slab-On-Ground

When rebuilding a restaurant destroyed by fire, these owners decided to replace 6x6 W2.9 x W2.9 specified steel with FORTA-FERRO macro synthetic fibers.

FORTA-FERRO® - Slab-On-Ground

Manheim High School specified FORTA-FERRO macro synthetic fibers when renovating and adding a new addition to their facility.

FORTA-FERRO® - Composite Steel Floor Deck-Slab

This multi-story educational building saved $50,000 by replacing specified wire mesh and rebar with FORTA-FERRO® reinforcement fiber.

FORTA-FERRO® - Parking Lot

Adding FORTA’s macro synthetic fiber saved time and money in this 10-inch SOG by eliminating traditional steel reinforcements.

FORTA-FERRO® - Composite Steel Floor Deck-Slab

Using fiber reinforcement allowed the contractor to remain on schedule and save money, even while facing supply shortages and increased labor costs.

FORTA-FERRO® - Slab-On-Ground

Based on this design, they specified 3.0 lb/cu yd of FORTA-FERRO macro synthetic fibers for the 220,000 sq ft floor for long-term durability and structural enhancements.

FORTA-FERRO® - Pavement

After many successful customer projects, owners were intent on using fiber reinforcement for their personal project.

FORTA-FERRO® - Slab-On-Ground

Watsontown Trucking replaced specified wire mesh in the slab-on-ground for this new warehouse construction.

FORTA-FERRO® - Slab-On-Ground

An extended joint system was implemented to meet the automated racking system’s requirements.