Fibrillated Microfibers

>> Back to Main Products Page

SubtitleDiv

ULTRA-NET®Projects

Project List:

Concrete Flotation Dock Units

John Wayne Memorial Marina, Sequim, WA - April 1984

Project Description:

FORTA® ULTRA-NET® was used at a dosage of 1.6 lbs./cubic yard to better control shrinkage cracks, improve impact resistance, reduce potential water permeability, and minimize the risk of internal corrosion expected of the welded wire mesh.

Project Photos: Click on a photo for larger view.

  • John Wayne Memorial Marina, Sequim, WA
  • John Wayne Memorial Marina, Sequim, WA
  • Volume: Approximately 25,000 sq. ft. / 500 cubic yards
  • Original Reinforcement: 2x2 – 14/14 WWF and perimeter pencil rod
  • Fiber Alternative: FORTA® ULTRA-NET® 3/4" and perimeter pencil rod
  • Contractor: Pacific Marine Industries, Bellingham, WA