Street Intersection Topping

ODOT 199-198 Whitetopping, Marietta, OH - June 1998

Project Description:

Fiber reinforced concrete (4" – 8" thick) was used on this whitetopping pour for a high traffic intersection where the existing asphalt was rutting/shoving. 680 yards of fiber reinforced concrete were used on this 1998 project at a main intersection in Marietta, Ohio. Ohio Department of Transportation Whitetopping mix design called for FORTA® ECONO-NET® 3/4" fibers to be used at a dosage rate of 3 pounds per cubic yard. Joints were cut every four feet.

Project Photos: Click on a photo for larger view.

  • FORTA® ECONO-NET® used at 3.0 lbs./cubic yard in this street whitetopping project.
  • Owner: Ohio Department of Transportation
  • Contractor: Shelly & Sands
  • Ready-Mix Producer: Smith Concrete, Marietta, Ohio